AK-01Class · AscentStatus · Prototype

Aakash Lifter

The first breath between soil and sky.

Aakash exists to make leaving Earth ordinary. A fully-reusable heavy lifter designed for daily cadence, engineered to turn launch into logistics.

Mission purpose

Rapid-turnaround cargo and crew ascent from equatorial spaceports to low Earth orbit.

Every civilization begins by learning to leave home. Aakash is our answer to gravity — a machine engineered not for spectacle, but for repetition.

Its methalox core burns clean, its avionics rewrite themselves between flights, and its structure is printed from a single ceramic-titanium weave grown in orbit.

One Aakash is a rocket. A fleet of them is a bridge.

Specifications

Nominal
Payload to LEO
148 t
Height
121 m
Propulsion
27× Vayu-3 methalox
Reuse target
1000 flights
Turnaround
< 6 hours

Core systems

  • Self-healing thermal skin
  • Autonomous return & catch
  • Modular cargo bays
  • Human-rated life support

Flight timeline

Projected
  1. 2026

    Static fire, full stack

  2. 2027

    First orbital flight

  3. 2029

    Crew certification

  4. 2031

    Daily launch cadence